Enviornmental & Bio-Engineering Lab.

Product Image (KCEBE-107/DL-1R)

TRANSIENT DRAINAGE PROCESSES IN STORAGE RESERVOIRS

Description: Functioning of a sugar chamber 1."Rainwater retention basin "experiment, rectangular weir as gate 2."Consecutive storage reservoirs" experiment, rectangular weir as overfall weir 3."Surge chamber" experiment: transparent pipe as surge chamber in drainage line of basin 4. Gate in the drainage line for generating water hammers 5. Pressure sensors at both basin and the surge chamber capture the pressure fluctuations 6.Respresentation of the pressure curves and course of the water levels with software 7.Data acquisition software and full accessories 8.The necessary technical data will be provided to standard.

Product Image (KCWT-101B-ETOR4)

Coagulation Flocculation Settling Pilot Plant

Coagulation - flocculation - settling processes are generally used to separate colloids from water, as in this case natural settling speed is too slow to obtain a sufficient clarification. This plant enables to study the coagulation, flocculation and settling processes separately or simultaneously and it mainly consists of a stirred feed tank, of two tanks for flocculent and coagulant, of a stirred coagulation tank, of a stirred flocculation tank and of a plate settler. Process control, data acquisition and supervision are automatically carried out by a microprocessor controller and by a specific control and supervision software that enables the remote control of various operational parameters.

Product Image (KCEBE-106)

Sedimentation Studies Apparatus

  • Material:Metal
  • Equipment Materials:PU
  • Operate Method:Manual
  • Usage:For College Labs
  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
Product Image (KCEBE-107)

Drainage and Seepage Tank

  • Supply Ability:1 Per Day
  • Delivery Time:2-4 Week
  • Usage:For Labs
  • Voltage:220 Volt (v)
  • Power:500 Watt (w)
  • Equipment Materials:SS
  • Material:Metal
Product Image (KCEBE-102)

Aerobic Digester

  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
  • Usage:For University
  • Weight:100-25000 Grams (g)
  • Material:Metal
  • Equipment Materials:SS
Product Image (KCEBE-108)

Model Sedimentation Tank

  • Usage:For College Labs
  • Operate Method:Manual
  • Equipment Materials:SS
  • Material:Metal
  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
Product Image (KCEBE-103)

Anaerobic Digester

  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
  • Equipment Materials:SS
  • Operate Method:Manual
  • Material:Metal
  • Usage:For College
Product Image (KCEBE-104)

Deep Bed Filter Column

  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
  • Operate Method:Electric
  • Equipment Materials:PU
  • Material:Metal
  • Voltage:220 Volt (v)
  • Power:500 Watt (w)
Product Image (KCEBE-101)

Aeration Unit

  • Supply Ability:1 Per Day
  • Delivery Time:2-4 Week
  • Display Type:Digital
  • Usage:For College
  • Voltage:220 Volt (v)
  • Power:500 Watt (w)
  • Equipment Materials:Brass
  • Material:Metal
Product Image (KCEBE-105)

Flocculation Test Unit

  • Delivery Time:2-4 Week
  • Supply Ability:1 Per Day
  • Operate Method:Manual
  • Equipment Materials:SS
  • Material:Metal
  • Usage:For University
X


Back to top